Commission Implementing Regulation (EU) 2019/1213 of 12 July 2019 laying down det... (32019R1213)
INHALT
Commission Implementing Regulation (EU) 2019/1213 of 12 July 2019 laying down detailed provisions ensuring uniform conditions for the implementation of interoperability and compatibility of on-board weighing equipment pursuant to Council Directive 96/53/EC (Text with EEA relevance.)
- COMMISSION IMPLEMENTING REGULATION (EU) 2019/1213
- of 12 July 2019
- laying down detailed provisions ensuring uniform conditions for the implementation of interoperability and compatibility of on-board weighing equipment pursuant to Council Directive 96/53/EC
- (Text with EEA relevance)
- Article 1
- Scope
- Article 2
- Definitions
- Article 3
- Certificates policy
- Article 4
- Periodic inspections
- Article 5
- OBW-workshops
- Article 6
- Entry into force and application
- ANNEX I
- GENERAL PROVISIONS FOR ON-BOARD WEIGHING EQUIPMENT (‘OBW’)
- 1.
- General provisions
- 2.
- Motor vehicle unit (‘MVU’)
- 3.
- Trailer unit (‘TU’)
- 4.
- Calculation of weight
- 5.
- Exchange of information between the motor vehicle and the trailers or semi-trailers of a vehicle combination
- 5.2. Stage 1 OBW
- 5.3. Stage 2 OBW
- 6.
- Data preparation and transfer to the DSRC-VU
- Figure 1
- Example of layout for OBW in a stage 1 truck/semi-trailer vehicle combination
- Figure 2
- Example of layout for OBW in a stage 2 truck/semi-trailer vehicle combination
- 7.
- Weight information to the driver
- 8.
- Accuracy
- ANNEX II
- SPECIFIC PROVISIONS FOR STAGE 2 OBW
- Figure 3
- Example of flow of messages in a stage 2 OBW
- 4. Exchange of information between motor vehicle and trailer or semi-trailer
- 5. Security provisions
- 5.1. Secure communication between C-ITS stations
- 5.2. Protection against security breach attempts
- APPENDIX TO ANNEX II
- SECURITY CERTIFICATION FOR STAGE 2 OBW
- 6. Assets to be protected by the ST
- Figure 4
- Example of OBW-VU messages and Weight messages to be protected in a MVU composed of two relevant modules
- 7. Threats to be addressed in the ST
- 9. Rationale
- ANNEX III
- DATA PREPARATION AND TRANSFER OF INFORMATION TO THE REDCR
- 2. On-board weighing system (‘OWS’) data transfer for stage 1 OBW
- Figure 5
- Transmission of OWS data from the MVU to the REDCR for stage 1 OBW
- 3. OWS data transfer for stage 2 OBW
- Figure 6
- Transmission of OWS data from the C-ITS station to the REDCR for stage 2 OBW
- 5. Communication between the DSRC-VU and the REDCR
- 6. Data structure
- 8. OWS data signature
- ANNEX IV
- PERIODIC INSPECTIONS
- 5. Three-load test
- 8. Specific provisions for dynamic OBWs
Feedback