COMMISSION REGULATION
(EC) No 706/2007
of 21 June 2007
laying down, pursuant to Directive 2006/40/EC of the European Parliament and of the Council, administrative provisions for the EC type-approval of vehicles, and a harmonised test for measuring leakages from certain air conditioning systems
(Text with EEA relevance)
Article 1
Subject matter
Article 2
Definitions
Article 3
EC component type-approval
Article 4
Administrative provisions for EC component type-approval
Article 5
EC component type-approval mark
Article 6
Administrative provisions for EC type-approval of a vehicle with regard to emissions from an air-conditioning system
Article 7
Harmonised leakage detection test
Article 8
Entry into force
List of Annexes
ANNEX I
ADMINISTRATIVE DOCUMENTS FOR EC TYPE-APPROVAL
PART 1
MODEL
Information document No … relating to EC component type-approval of an air-conditioning system or of a component thereof
0 GENERAL
9. BODYWORK
PART 2
MODEL
EC TYPE-APPROVAL CERTIFICATE
(maximum format: A4 (210 × 297 mm))
SECTION I
SECTION II
Addendum
to EC type-approval certificate No …
concerning the type-approval of an air-conditioning system or leak component with regard to Directive 2006/40/EC
PART 3
EC COMPONENT TYPE-APPROVAL MARK
1. GENERAL
2. EXAMPLE OF THE EC COMPONENT TYPE-APPROVAL MARK
PART 4
MODEL
Information document No … relating to EC type-approval of a vehicle with regard to emissions from air-conditioning system
0 GENERAL
9. BODYWORK
PART 5
MODEL
EC TYPE-APPROVAL CERTIFICATE
(maximum format: A4 (210 × 297 mm))
SECTION I
SECTION II
Addendum
to EC type-approval certificate No …
concerning the type-approval of a vehicle with regard to Directive 2006/40/EC
ANNEX II
TECHNICAL PROVISIONS FOR THE DETERMINATION OF LEAKAGES FROM AIR-CONDITIONING SYSTEMS
1. INTRODUCTION
2. DESCRIPTION OF TEST
3. TEST EQUIPMENT
3.1. Measurement enclosure
3.2. Measuring equipment
3.3. Gas analyser data recording system
3.4. Additional equipment
3.4.1. Temperature recording
3.4.2. Pressure measuring device
3.4.3. Fans
3.4.4. Gases
4. PRECONDITIONING
4.1. General requirement
4.2. Preconditioning conditions
|
Option 1 |
Option 2 |
|
System part |
40 °C Time [h] |
Step 1 — 50 °C Time [h] |
Step 2 — 40 °C Time [h] |
Complete system |
480 |
240 |
24 |
Compressor |
144 |
72 |
24 |
Hose assemblies |
480 |
240 |
24 |
All other leak parts |
96 |
48 |
24 |
4.3. Compressor
5. TEST SEQUENCE
5.1. General requirements
5.2. Leakage test
Figure I
5.3. Calculation
[Bild bitte in Originalquelle ansehen] HFC-134a |
= Leak flow rate of HFC-134a |
[kg/s] |
nHFC-134a |
= Number of moles of HFC-134a |
[mol] |
Vshed |
= SHED-chamber net volume |
[m3] |
VAC |
= Gross volume of the air-conditioning system or component |
[m3] |
Tshed |
= Temperature in the SHED |
[K] |
Pshed |
= Pressure in the SHED |
[kPa] |
CHFC-134ae |
= HFC-134a final concentration |
[ppmv] |
CHFC-134ai |
= HFC-134a initial concentration |
[ppmv] |
te |
= Final time |
[s] |
ti |
= Initial time |
[s] |
MHFC-134a |
= Molar mass of HFC-134a(=102 kg/kmol) |
[kg/kmol] |
R |
= Gas constant(= 8,314 kJ/(kmol*K)) |
[kJ/(kmol*K)] |
5.4. Overall results of test
6. APPROVAL
L (g/y) |
AC Refrigerant |
40/60(1) |
HFC-134a |
Appendix
Calibration of equipment for leakage testing
1. CALIBRATION FREQUENCY AND METHODS
2. CALIBRATION OF THE MEASUREMENT ENCLOSURE
2.1. Initial determination of measurement enclosure internal volume
2.2. Determination of measurement enclosure background emissions
2.3. Calibration and HFC-134a retention test of the measuring enclosure
mHFC-134a |
= Mass of HFC-134a |
[kg] |
Vshed |
= Volume of the chamber |
[m3] |
Tshed |
= Temperature in the SHED |
[K] |
Pshed |
= Pressure in the SHED |
[kPa] |
C |
= HFC-134a concentration |
[ppmv] |
MHFC-134a |
= Molar mass of HFC-134a (= 102 kg/kmol) |
[kg/kmol] |
R |
= Gas constant (= 8,314 kJ/(kmol*K)) |
[kJ/(kmol*K)] |
Volume of measurement enclosure (L) |
Injected mass (g) |
5 |
6,0E-04 |
10 |
1,2E-03 |
50 |
6,0E-03 |
100 |
1,2E-02 |
500 |
6,0E-02 |
1 000 |
1,2E-01 |
2 000 |
2,4E-01 |
3 000 |
3,6E-01 |
4 000 |
4,8E-01 |