Council Regulation (EU) 2022/2577 of 22 December 2022 laying down a framework to ... (32022R2577)
INHALT
Council Regulation (EU) 2022/2577 of 22 December 2022 laying down a framework to accelerate the deployment of renewable energy
- COUNCIL REGULATION (EU) 2022/2577
- of 22 December 2022
- laying down a framework to accelerate the deployment of renewable energy
- Article 1
- Subject matter and scope
- Article 2
- Definitions
- Article 3
- Overriding public interest
- Article 4
- Accelerating the permit-granting process for the installation of solar energy equipment
- Article 5
- Repowering of renewable energy power plants
- Article 6
- Acceleration of the permit-granting process of renewable energy projects and for related grid infrastructure which is necessary to integrate renewables into the system
- Article 7
- Acceleration of the deployment of heat pumps
- Article 8
- Timelines for the permit-granting process for the installation of solar energy equipment, the repowering of renewable energy power plants and for the deployment of heat pumps
- Article 9
- Review
- Article 10
- Entry into force and application
Feedback