Commission Regulation (EC) No 414/2007 of 13 March 2007 concerning the technical ... (32007R0414)
INHALT
Commission Regulation (EC) No 414/2007 of 13 March 2007 concerning the technical guidelines for the planning, implementation and operational use of river information services (RIS) referred to in Article 5 of Directive 2005/44/EC of the European Parliament and of the Council on harmonised river information services (RIS) on inland waterways in the Community
- COMMISSION REGULATION (EC)
- No 414/2007
- of 13 March 2007
- concerning the technical guidelines for the planning, implementation and operational use of river information services (RIS) referred to in Article 5 of Directive 2005/44/EC of the European Parliament and of the Council on harmonised river information services (RIS) on inland waterways in the Community
- Article 1
- Article 2
- ANNEX
- RIS guidelines
- ABBREVIATIONS
- FIGURES
- TABLES
- 1. INTRODUCTION
- 2. DEFINITIONS
- 2.1. River information services (RIS)
- 2.2. RIS system
- 2.3. RIS area
- 2.4. RIS centre
- 2.5. Inland VTS
- 2.6. VTS area
- 2.7. VTS centre
- 2.8. Competent authority
- 2.9. RIS authority
- 2.10. RIS users
- 2.11. Levels of RIS information
- 2.12. Vessel tracking and tracing
- 3. PARTICIPATING VESSELS
- 4. RIS ARCHITECTURE
- 4.1. General
- 4.2. RIS stakeholders
- 4.2.1. Policy makers
- 4.2.2. Regional managers
- 4.2.3. System engineers
- 4.2.4. Service providers
- 4.2.5. RIS users
- 4.3. RIS objectives
- 4.4. RIS tasks
- Figure 4.4.a.
- 4.5. River information services
- Table 4.5
- River information services
- Mainly traffic related
- 1. Fairway information service (FIS)
- 2. Traffic information (TI)
- 3. Traffic management (TM)
- Mainly transport related
- 5. Information for transport logistics/management (ITL)
- 4.6. RIS functions and information needs
- 4.7. RIS applications
- 4.8. RIS systems
- 5. RECOMMENDATIONS FOR INDIVIDUAL SERVICES
- 5.1. Fairway information service (FIS)
- 5.1.1. General
- 5.1.2. Radiotelephone service on inland waterways
- 5.1.3. Internet service
- 5.1.4. Electronic navigational chart service (Inland ECDIS)
- 5.2. Traffic information service
- 5.2.1. General
- 5.2.2. Tactical traffic information (TTI)
- 5.2.3. Strategic traffic information (STI)
- 5.3. Traffic management
- 5.3.1. Local traffic management (vessel traffic services — VTS)
- 5.3.2. Navigational support
- 5.3.3. Lock and bridge management
- 5.4. Calamity abatement support
- 5.5. Information for transport logistics
- 5.6. Information for law enforcement
- 6. PLANNING OF RIS
- 6.1. General
- 6.2. Responsibilities
- 6.3. Liability
- 6.4. Planning process
- Table 6.4
- The planning process for RIS
- A. PRELIMINARY INVESTIGATION
- 1. Description and analysis of the existing and future situation in the area
- B. APPLICATION DESIGN
- 1. Design of one or more future RIS applications
- 2. Evaluation of future RIS applications
- 3. Organisational structure of the future RIS applications
- 6.5. Training
- 7. STEPWISE DEVELOPMENT OF RIS
- 8. RIS STANDARDISATION PROCEDURES
- Appendix
- Example of an information processing loop to Chapter 4.4
Feedback