Commission Regulation (EU) No 1169/2010 of 10 December 2010 on a common safety me... (32010R1169)
INHALT
Commission Regulation (EU) No 1169/2010 of 10 December 2010 on a common safety method for assessing conformity with the requirements for obtaining a railway safety authorisation Text with EEA relevance
- COMMISSION REGULATION (EU) No 1169/2010
- of 10 December 2010
- on a common safety method for assessing conformity with the requirements for obtaining a railway safety authorisation
- (Text with EEA relevance)
- Article 1
- Subject-matter
- Article 2
- Definition
- Article 3
- Procedures for assessing applications
- Article 4
- Supervision
- Article 5
- Entry into force
- ANNEX I
- Procedure for assessing conformity with requirements for obtaining safety authorisations to be issued in accordance with Article 11(1)(a) and (b) of Directive 2004/49/EC
- (a) Setting up and reviewing the assessment process
- (b) Quality of the assessment process
- (c) Scope of the assessment
- (d) Timing of the assessment
- (e) Decision making during the assessment
- ANNEX II
- Criteria for assessing conformity with the requirements for obtaining safety authorisations to be issued in accordance with Article 11(1)(a) and (b) of Directive 2004/49/EC
- A. RISK CONTROL MEASURES FOR ALL RISKS ASSOCIATED WITH THE ACTIVITY OF THE INFRASTRUCTURE MANAGER(1)
- B. RISK CONTROL RELATED TO THE SUPPLY OF MAINTENANCE AND MATERIAL(2)
- C. RISK CONTROL RELATED TO THE USE OF CONTRACTORS AND CONTROL OF SUPPLIERS(3)
- D. RISKS ARISING FROM THE ACTIVITIES OF OTHER PARTIES EXTERNAL TO THE RAILWAY SYSTEM(4)
- E. DOCUMENTATION OF THE SAFETY MANAGEMENT SYSTEM
- F. DISTRIBUTION OF RESPONSIBILITIES(5)
- G. SECURING CONTROL BY THE MANAGEMENT ON DIFFERENT LEVELS(6)
- H. INVOLVING STAFF AND THEIR REPRESENTATIVES ON ALL LEVELS(7)
- I. ENSURING CONTINUOUS IMPROVEMENT(8)
- J. SAFETY POLICY APPROVED BY THE ORGANISATION’S CHIEF EXECUTIVE AND COMMUNICATED TO ALL STAFF(9)
- K. QUALITATIVE AND QUANTATIVE TARGETS OF THE ORGANISATION FOR MAINTAINING AND ENHANCING SAFETY, AND PLANS AND PROCEDURES FOR REACHING THESE TARGETS(10)
- L. PROCEDURES TO MEET EXISTING, NEW AND ALTERED TECHNICAL AND OPERATIONAL STANDARDS OR OTHER PRESCRIPTIVE CONDITIONS(11)
- M. PROCEDURES AND METHODS FOR CARRYING OUT RISK EVALUATION AND IMPLEMENTING RISK CONTROL MEASURES WHENEVER A CHANGE OF THE OPERATING CONDITIONS OR NEW MATERIAL IMPOSES NEW RISKS ON THE INFRASTRUCTURE OR ON OPERATION(12)
- N. PROVISION OF STAFF TRAINING PROGRAMMES AND SYSTEMS TO ENSURE THAT STAFF COMPETENCE IS MAINTAINED AND TASKS CARRIED OUT ACCORDINGLY(14)
- O. ARRANGEMENTS FOR THE PROVISION OF SUFFICIENT INFORMATION WITHIN THE ORGANISATION AND, WHERE APPROPRIATE, BETWEEN ORGANISATIONS OPERATING ON THE SAME INFRASTRUCTURE(15)
- P. PROCEDURES AND FORMATS FOR DOCUMENTING SAFETY INFORMATION, AND DESIGNATION OF A PROCEDURE FOR CONFIGURATION CONTROL OF VITAL SAFETY INFORMATION(16)
- Q. PROCEDURES TO ENSURE THAT ACCIDENTS, INCIDENTS, NEAR MISSES AND OTHER DANGEROUS OCCURRENCES ARE REPORTED, INVESTIGATED AND ANALYSED AND THAT NECESSARY PREVENTIVE MEASURES ARE TAKEN(17)
- R. PROVISION OF PLANS FOR ACTION AND ALERTS AND INFORMATION IN CASE OF EMERGENCY, AGREED UPON WITH THE APPROPRIATE PUBLIC AUTHORITIES(18)
- S. PROVISIONS FOR RECURRENT INTERNAL AUDITING OF THE SAFETY MANAGEMENT SYSTEM(19)
- T. SAFE DESIGN OF THE RAILWAY INFRASTRUCTURE(20)
- U. SAFE OPERATION OF THE INFRASTRUCTURE(21)
- V. PROVISION OF MAINTENANCE & MATERIAL(22)
- W. MAINTENANCE AND OPERATION OF THE TRAFFIC CONTROL AND SIGNALLING SYSTEM(23)
- ANNEX III
- Principles for supervision after the award of an authorisation