Regulation (EU) 2016/424 of the European Parliament and of the Council of 9 March... (32016R0424)
INHALT
Regulation (EU) 2016/424 of the European Parliament and of the Council of 9 March 2016 on cableway installations and repealing Directive 2000/9/EC (Text with EEA relevance)
- REGULATION (EU) 2016/424 OF THE EUROPEAN PARLIAMENT AND OF THE COUNCIL
- of 9 March 2016
- on cableway installations and repealing Directive 2000/9/EC
- (Text with EEA relevance)
- CHAPTER I
- GENERAL PROVISIONS
- Article 1
- Subject matter
- Article 2
- Scope
- Article 3
- Definitions
- Article 4
- Making available on the market of subsystems and safety components
- Article 5
- Entry into service of cableway installations
- Article 6
- Essential requirements
- Article 7
- Free movement of subsystems and safety components
- Article 8
- Safety analysis and safety report for planned cableway installations
- Article 9
- Authorisation of cableway installations
- Article 10
- Operation of cableway installations
- CHAPTER II
- OBLIGATIONS OF ECONOMIC OPERATORS
- Article 11
- Obligations of manufacturers
- Article 12
- Authorised representatives
- Article 13
- Obligations of importers
- Article 14
- Obligations of distributors
- Article 15
- Cases in which obligations of manufacturers apply to importers and distributors
- Article 16
- Identification of economic operators
- CHAPTER III
- CONFORMITY OF SUBSYSTEMS AND SAFETY COMPONENTS
- Article 17
- Presumption of conformity of subsystems and safety components
- Article 18
- Conformity assessment procedures
- Article 19
- EU declaration of conformity
- Article 20
- General principles of the CE marking
- Article 21
- Rules and conditions for affixing the CE marking
- CHAPTER IV
- NOTIFICATION OF CONFORMITY ASSESSMENT BODIES
- Article 22
- Notification
- Article 23
- Notifying authorities
- Article 24
- Requirements relating to notifying authorities
- Article 25
- Information obligation on notifying authorities
- Article 26
- Requirements relating to notified bodies
- Article 27
- Presumption of conformity of notified bodies
- Article 28
- Subsidiaries of and subcontracting by notified bodies
- Article 29
- Application for notification
- Article 30
- Notification procedure
- Article 31
- Identification numbers and lists of notified bodies
- Article 32
- Changes to notifications
- Article 33
- Challenge of the competence of notified bodies
- Article 34
- Operational obligations of notified bodies
- Article 35
- Appeal against decisions of notified bodies
- Article 36
- Information obligation on notified bodies
- Article 37
- Exchange of experience
- Article 38
- Coordination of notified bodies
- CHAPTER V
- UNION MARKET SURVEILLANCE, CONTROL OF SUBSYSTEMS AND SAFETY COMPONENTS ENTERING THE UNION MARKET AND UNION SAFEGUARD PROCEDURE
- Article 39
- Union market surveillance and control of subsystems and safety components entering the Union market
- Article 40
- Procedure at national level for dealing with subsystems or safety components presenting a risk
- Article 41
- Union safeguard procedure
- Article 42
- Compliant subsystems or safety components which present a risk
- Article 43
- Formal non-compliance
- CHAPTER VI
- COMMITTEE PROCEDURE, TRANSITIONAL AND FINAL PROVISIONS
- Article 44
- Committee procedure
- Article 45
- Penalties
- Article 46
- Transitional provisions
- Article 47
- Repeal
- Article 48
- Entry into force and application
- ANNEX I
- SUBSYSTEMS
- ANNEX II
- ESSENTIAL REQUIREMENTS
- 1. Purpose
- 2. General requirements
- 2.1. Safety of persons
- 2.2. Principles of safety
- 2.3. Consideration of external factors
- 2.4. Dimensions
- 2.5. Assembly
- 2.6. Integrity of the cableway installation
- 2.7. Safety devices
- 2.8. Maintainability
- 2.9. Nuisance
- 3. Infrastructure requirements
- 3.1. Layout, speed, distance between vehicles
- 3.2. Stations and structures along the line
- 4. Requirements relating to cables, drives and brakes and to mechanical and electrical installations
- 4.1. Cables and their supports
- 4.2. Mechanical installations
- 4.2.1. Drives
- 4.2.2. Standby drive
- 4.2.3. Braking
- 4.3. Control devices
- 4.4. Communication devices
- 5. Vehicles and towing devices
- 6. Equipment for passengers and operating personnel
- 7. Operability
- 7.1. Safety
- 7.2. Safety in the event of immobilisation of the cableway installation
- 7.3. Other special provisions concerning safety
- 7.3.1. Operators' stands and workplaces
- 7.3.2. Risk of falling
- ANNEX III
- CONFORMITY ASSESSMENT PROCEDURES FOR SUBSYSTEMS AND SAFETY COMPONENTS: MODULE B: EU-TYPE EXAMINATION — PRODUCTION TYPE
- ANNEX IV
- CONFORMITY ASSESSMENT PROCEDURES FOR SUBSYSTEMS AND SAFETY COMPONENTS: MODULE D: CONFORMITY TO TYPE BASED ON QUALITY ASSURANCE OF THE PRODUCTION PROCESS
- 2. Manufacturing
- 3. Quality system
- 4. Surveillance under the responsibility of the notified body
- 5. CE marking and EU declaration of conformity
- 8. Authorised representative
- ANNEX V
- CONFORMITY ASSESSMENT PROCEDURES FOR SUBSYSTEMS AND SAFETY COMPONENTS: MODULE F: CONFORMITY TO TYPE BASED ON SUBSYSTEM OR SAFETY COMPONENT VERIFICATION
- 2. Manufacturing
- 3. Verification
- 4. Verification of conformity by examination and testing of every subsystem or safety component
- 5. Statistical verification of conformity
- 6. CE marking and EU declaration of conformity
- 8. Authorised representative
- ANNEX VI
- CONFORMITY ASSESSMENT PROCEDURES FOR SUBSYSTEMS AND SAFETY COMPONENTS: MODULE G: CONFORMITY BASED ON UNIT VERIFICATION
- 2. Manufacturing
- 3. Verification
- 4. CE marking and EU declaration of conformity
- 5. Authorised representative
- ANNEX VII
- CONFORMITY ASSESSMENT PROCEDURES FOR SUBSYSTEMS AND SAFETY COMPONENTS: MODULE H 1: CONFORMITY BASED ON FULL QUALITY ASSURANCE PLUS DESIGN EXAMINATION
- 2. Manufacturing
- 3. Quality system
- 3.6. Design examination
- 4. Surveillance under the responsibility of the notified body
- 5. CE marking and EU declaration of conformity.
- 8. Authorised representative
- ANNEX VIII
- TECHNICAL DOCUMENTATION FOR SUBSYSTEMS AND SAFETY COMPONENTS
- ANNEX IX
- EU DECLARATION OF CONFORMITY FOR SUBSYSTEMS AND SAFETY COMPONENTS No …
- (
- *
- )
- ANNEX X
- CORRELATION TABLE
Feedback