COMMISSION IMPLEMENTING DECISION (EU) 2018/1135
of 10 August 2018
establishing the type, format and frequency of information to be made available by the Member States for the purposes of reporting on the implementation of Directive 2010/75/EU of the European Parliament and of the Council on industrial emissions
(notified under document C(2018) 5009)
(Text with EEA relevance)
Article 1
Article 2
ANNEX I
Information on installations covered by Chapters II, III and IV of Directive 2010/75/EU [with the exception of waste incineration plants and waste co-incineration plants with a nominal capacity of less than 2 tonnes per hour]
|
|||
Type |
Format |
||
|
Identification of the country where the reported installations and installation parts are located. |
||
|
Calendar year to which the reporting refers. |
|
|||||||||||
Type |
Format |
||||||||||
|
Unique identifier of the installation that follows the requirements of Directive 2007/2/EC. |
||||||||||
|
Thematic object identifier. |
||||||||||
|
Latitude and longitude (coordinates for the approximate centre of the installation) expressed with reference to the ETRS89 (2D)-EPSG:4258 coordinate reference system to a precision of 5 decimal places. |
||||||||||
|
Official denomination, proper name or conventional name of the installation. |
||||||||||
|
The operational status of the installation |
||||||||||
|
For activities covered by Annex I to Directive 2010/75/EU, the name of and contact information for:
|
||||||||||
|
Identification of all activities covered by Annex I to Directive 2010/75/EU carried out within the installation. |
||||||||||
|
As from the reporting year 2018, identification of the Commission Implementing Decisions on BAT conclusions that are applicable to any of the activities carried out at the installation. |
||||||||||
|
Identification of the Chapters of Directive 2010/75/EU that apply to the installation (or part thereof). |
||||||||||
|
An indication of whether a baseline report as referred to in Article 22(2) of Directive 2010/75/EU, has been submitted to the competent authority. |
||||||||||
|
|
||||||||||
|
|
||||||||||
|
For installations where the permit conditions have been reconsidered in accordance with Article 21(3) of that Directive, an indication of whether a derogation was granted under its Article 15(4). As from the reporting year 2018, where a derogation has been granted, information about:
|
||||||||||
|
As from the reporting year 2018, for installations where the permit conditions have been reconsidered in accordance with Article 21(3), a specification of whether the permit sets stricter emission limit values than the lower value of the BAT-AEL range, indicating:
|
||||||||||
|
|
||||||||||
|
As from the reporting year 2018, an indication of how the results of emission monitoring have been made available to the public under Article 24(3)(b), including a URL if websites have been created for this purpose. |
||||||||||
|
As from the reporting year 2018, where the installation is covered by Directive 2012/18/EU the Seveso Plants Information Retrieval System identifier (‘eSPIRS identifier’) for the establishment in which the installation is located. Optional. |
||||||||||
|
As from the reporting year 2018, where the installation is, fully or partly, covered by Directive 2003/87/EC the identifier used for reporting under that Directive. Optional. |
||||||||||
|
Any other relevant information. Optional. |
|
|||||||||||||
Type |
Format |
||||||||||||
1.3.1 General information |
|||||||||||||
|
Unique identifier that follows the requirements of Directive 2007/2/EC, as further specified in Regulation (EU) No 1089/2010, in particular point 8 of Annex IV to that Regulation, as amended. |
||||||||||||
|
Thematic object identifier. |
||||||||||||
|
Latitude and longitude (coordinates for the approximate centre of the plant) expressed with reference to the ETRS89 (2D)-EPSG:4258 coordinate reference system to a precision of 5 decimal places. |
||||||||||||
|
Official denomination or proper or conventional name of the plant. |
||||||||||||
|
The operational status of the plant. |
||||||||||||
1.3.2. Information on large combustion plants |
|||||||||||||
|
Total rated thermal input of the large combustion plant. |
||||||||||||
|
Details of any derogations as provided for in Articles 31 to 35 of Directive 2010/75/EU granted in respect of the large combustion plant. |
||||||||||||
|
Any other relevant information. Optional. |
||||||||||||
1.3.3. Information on waste incineration and waste co-incineration plants with a nominal capacity of 2 tonnes or more per hour |
|||||||||||||
|
Total nominal capacity of the waste incineration or waste co-incineration plant. |
||||||||||||
|
Total permitted capacity for hazardous waste incineration and co-incineration. |
||||||||||||
|
Total permitted capacity for non-hazardous waste incineration and co-incineration. |
||||||||||||
|
As from the reporting year 2018, an indication of:
|
||||||||||||
|
|
||||||||||||
|
As from the reporting year 2018, an indication of how the information referred to in Article 55(2) of Directive 2010/75/EU has been made available to the public, including a URL if websites have been created for this purpose. |
||||||||||||
|
Any other relevant information. Optional. |
|
|||
Type |
Format |
||
|
Unique identifier of the facility that follows the requirements of Directive 2007/2/EC. |
||
|
Thematic object identifier. |
||
|
Code identifier and/or name assigned to the basin district of a watercourse. |
||
|
Latitude and longitude (coordinates for the approximate centre of the facility) expressed with reference to the ETRS89 (2D)-EPSG:4258 coordinate reference system to a precision of 5 decimal places. |
||
|
Activities performed by the facility. Function is described by the activity of the facility expressed as NACE-code. |
||
|
Official denomination or proper or conventional name of the facility. |
||
|
The operational status of the facility. |
||
|
Any other relevant information. Optional. |
ANNEX II
Information on waste incineration plants and waste co-incineration plants with a nominal capacity of less than 2 tonnes per hour and on installations covered by Chapter V of Directive 2010/75/EU
|
A reference to the list of such installations made publicly available in accordance with Article 55(3) of Directive 2010/75/EU. |
||||||||||
|
|