DIRECTIVE 2014/29/EU OF THE EUROPEAN PARLIAMENT AND OF THE COUNCIL
of 26 February 2014
on the harmonisation of the laws of the Member States relating to the making available on the market of simple pressure vessels
(recast)
(Text with EEA relevance)
CHAPTER 1
GENERAL PROVISIONS
Article 1
Scope
Article 2
Definitions
Article 3
Making available on the market and putting into service
Article 4
Essential requirements
Article 5
Free movement
CHAPTER 2
OBLIGATIONS OF ECONOMIC OPERATORS
Article 6
Obligations of manufacturers
Article 7
Authorised representatives
Article 8
Obligations of importers
Article 9
Obligations of distributors
Article 10
Cases in which obligations of manufacturers apply to importers and distributors
Article 11
Identification of economic operators
CHAPTER 3
CONFORMITY OF VESSELS OF WHICH THE PRODUCT OF PS × V EXCEEDS 50 bar.L
Article 12
Presumption of conformity of vessels of which the product of PS × V exceeds 50 bar.L
Article 13
Conformity assessment procedures
Article 14
EU declaration of conformity
Article 15
General principles of the CE marking
Article 16
Rules and conditions for affixing the CE marking and inscriptions
CHAPTER 4
NOTIFICATION OF CONFORMITY ASSESSMENT BODIES
Article 17
Notification
Article 18
Notifying authorities
Article 19
Requirements relating to notifying authorities
Article 20
Information obligation on notifying authorities
Article 21
Requirements relating to notified bodies
Article 22
Presumption of conformity of notified bodies
Article 23
Subsidiaries of and subcontracting by notified bodies
Article 24
Application for notification
Article 25
Notification procedure
Article 26
Identification numbers and lists of notified bodies
Article 27
Changes to notifications
Article 28
Challenge of the competence of notified bodies
Article 29
Operational obligations of notified bodies
Article 30
Appeal against decisions of notified bodies
Article 31
Information obligation on notified bodies
Article 32
Exchange of experience
Article 33
Coordination of notified bodies
CHAPTER 5
UNION MARKET SURVEILLANCE, CONTROL OF VESSELS ENTERING THE UNION MARKET AND UNION SAFEGUARD PROCEDURE
Article 34
Union market surveillance and control of vessels entering the Union market
Article 35
Procedure for dealing with vessels presenting a risk at national level
Article 36
Union safeguard procedure
Article 37
Compliant vessels which present a risk
Article 38
Formal non-compliance
CHAPTER 6
COMMITTEE, TRANSITIONAL AND FINAL PROVISIONS
Article 39
Committee procedure
Article 40
Penalties
Article 41
Transitional provisions
Article 42
Transposition
Article 43
Repeal
Article 44
Entry into force and application
Article 45
Addressees
ANNEX I
ESSENTIAL SAFETY REQUIREMENTS
1.
Materials
1.1.
Pressurised parts
1.1.1.
Steel vessels
thickness ≥ 3 mm: |
A |
≥ 22 %, |
thickness < 3 mm: |
A80 mm |
≥ 17 %, |
thickness ≥ 3 mm: |
A |
≥ 20 %, |
thickness < 3 mm: |
A80 mm |
≥ 15 %, |
1.1.2.
Aluminium vessels
1.2.
Welding materials
1.3.
Accessories contributing to the strength of the vessel
1.4.
Non-pressurised parts
2.
Vessel design
2.1.
Wall thickness
2.1.1.
Calculation method
2.1.2.
Experimental method
3.
Manufacturing processes
3.1.
Preparation of the component parts
3.2.
Welds on pressurised parts
4.
Putting into service of the vessels
ANNEX II
CONFORMITY ASSESSMENT PROCEDURES
1.
EU-Type examination (Module B)
2.
Conformity to type based on internal production control plus supervised vessel testing (Module C1)
2.2.
Manufacturing
2.3.
Vessel checks
2.4.
CE marking and EU declaration of conformity
2.5.
Authorised representative
3.
Conformity to type based on internal production control plus supervised vessel checks at random intervals (Module C2)
3.2.
Manufacturing
3.3.
Vessel checks
3.4.
CE marking and EU declaration of conformity
3.5.
Authorised representative
4.
Conformity to type based on internal production control (Module C)
4.2.
Manufacturing
4.3.
CE marking and EU declaration of conformity
4.4.
Authorised representative
ANNEX III
INSCRIPTIONS, INSTRUCTIONS, DEFINITIONS AND SYMBOLS
1.
CE marking and inscriptions
2.
Instructions and safety information
3.
Definitions and symbols
3.1.
Definitions
3.2.
Symbols
A |
elongation after fracture (Lo = 5,65√So) |
% |
A80 mm |
elongation after fracture (Lo = 80 mm) |
% |
KCV |
bending rupture energy |
J/cm2 |
P |
design pressure |
Bar |
PS |
maximum working pressure |
Bar |
Ph |
hydrostatic or pneumatic test pressure |
Bar |
Rp0,2 |
0,2 % proof strength |
N/mm2 |
ReT |
yield strength at maximum working temperature |
N/mm2 |
ReH |
upper yield point |
N/mm2 |
Rm |
tensile strength |
N/mm2 |
Rm, max |
maximum tensile strength |
N/mm2 |
Rp1,0 |
1,0 % proof strength |
N/mm2 |
Tmax |
maximum working temperature |
°C |
Tmin |
minimum working temperature |
°C |
V |
capacity of the vessel |
L |
ANNEX IV
EU DECLARATION OF CONFORMITY (No XXXX)(1)
ANNEX V
PART A
Directive 2009/105/EC of the European Parliament and of the Council |
|
Regulation (EU) No 1025/2012 of the European Parliament and of the Council |
Only point (j) of Article 26(1) |
PART B
Directive |
Time-limits for transposition |
Date of application |
87/404/EEC |
31 December 1989 |
1 July 1990(1) |
90/488/EEC |
1 July 1991 |
— |
93/68/EEC |
30 June 1994 |
1 January 1995(2) |
ANNEX VI
Directive 2009/105/EC |
This Directive |
Article 1(1) |
Article 1(1), introductory wording |
Article 1(2) |
Article 1(2) |
Article 1(3)(a) |
Article 1(1), points (a) to (e) |
Article 1(3)(b) |
— |
Article 2 |
Article 3 |
— |
Article 2 |
Article 3 |
Article 4 |
Article 4 |
Article 5 |
— |
Article 6 |
— |
Article 7 |
— |
Article 8 |
— |
Article 9 |
— |
Article 10 |
— |
Article 11 |
— |
Article 12 |
Article 5 |
— |
Article 6 |
— |
Article 7 |
— |
Article 8 |
— |
— |
Article 13 |
Article 9 |
— |
Article 10 |
— |
Article 11(1) and (2) |
— |
Article 11(3) |
Annex II, point 2.3 |
Article 12 |
— |
Article 13(1) |
Annex II, point 3.2.1 |
Article 13(2) |
Annex II, point 3.2.2 |
Article 13(3) |
— |
Article 14 |
— |
— |
Article 14 |
— |
Article 15 |
— |
Article 16 |
— |
Article 17 |
— |
Article 18 |
— |
Article 19 |
— |
Article 20 |
— |
Article 21 |
— |
Article 22 |
— |
Article 23 |
— |
Article 24 |
— |
Article 25 |
— |
Article 26 |
— |
Article 27 |
— |
Article 28 |
— |
Article 29 |
— |
Article 30 |
— |
Article 31 |
— |
Article 32 |
— |
Article 33 |
Article 15 |
— |
Article 16 |
— |
Article 17 |
— |
— |
Article 34 |
— |
Article 35 |
— |
Article 36 |
— |
Article 37 |
— |
Article 38 |
— |
Article 39 |
— |
Article 40 |
— |
Article 41 |
Article 18 |
Article 42(2) |
— |
Article 42(1) |
Article 19 |
Article 43 |
Article 20 |
Article 44 |
Article 21 |
Article 45 |
Annex I |
Annex I |
— |
Annex II |
Annex II, points 1, 2 and 4 |
Annex III |
Annex II, point 3 |
Annex II, points 1.3(c), 2.2, 3.2.2 and 4.2(a)(b)(c) |
Annex III |
— |
— |
Annex IV |
Annex IV |
Annex V |
Annex V |
Annex VI |